This solar site survey checklist is for the owner, ops manager, or survey lead who wants every survey to come back usable the first time. The site survey is the first time your company sees the job up close after the sale. What gets captured here feeds engineering, the plan set, the permit, and the install. When the survey is complete, the designer can work without calling anyone. When it's missing a photo of the main panel or a note about a damaged rafter, the job goes back for a second visit, and that costs a truck roll and time.
Why surveys come back incomplete
- No standard list. Each surveyor captures what they think matters, so what comes back is different every time.
- Photos end up on a phone. The pictures exist, but they're in a camera roll or a text thread instead of on the job.
- Notes aren't tied to photos. "Panel looks full" doesn't help without the picture and the label it refers to.
- Engineering sees it too late. Problems that could have been flagged on site get found days later during design.
- Nobody owns the next step. The survey is done, but nobody moves the job to engineering.
Before the visit
- Confirm who is doing the survey: the rep, or your own survey crew.
- Confirm the appointment with the homeowner and note access instructions.
- Review the sold system size, equipment, and any promises from the sale.
- Pull up the utility bill and anything the rep noted about the roof or electrical.
- Check the local AHJ and utility requirements that affect what you need to capture.
- Make sure the surveyor knows exactly which photos and measurements are required.
On the roof
- Overall photos of every roof plane that may get panels
- Roof material and condition, with close-ups of any damage, soft spots, or repairs
- Approximate age of the roof, if the homeowner knows
- Obstructions: vents, skylights, chimneys, satellite dishes, trees that cast shade
- Attic or rafter photos showing framing size and spacing where you can access them
- Measurements your design team needs that they can't get from imagery
Electrical
- Main service panel, door open and closed, with the label legible
- Main breaker rating and bus rating as shown on the label
- Available breaker space
- Meter, with the meter number visible
- Proposed locations for inverter, disconnects, and any battery equipment
- Grounding and any visible issues worth flagging
- Sub-panels, if present
Site and access
- Where equipment and conduit can run
- Ladder and staging access for the crew
- Gates, pets, parking, and anything the install crew needs to know
- HOA or homeowner preferences about where equipment goes
Homeowner notes
- Anything the homeowner asked for or worried about
- Confirm what was sold matches what the homeowner expects
- Who to contact for scheduling the install
After the visit
- Attach everything to the job the same day. Photos and notes should land on the project record, not stay on a device.
- Flag issues for engineering right away. A full panel, a damaged roof, or a shading problem may change the design or the scope. Say so on the job.
- Move the job to engineering with an owner. The survey isn't finished until someone owns the next step and has a follow-up date.
- Tell the rep about anything that changes the deal. If the scope may change, the rep and homeowner should hear it early, not at permit.
Common survey misses
- The main panel label is blurry or not photographed.
- No attic or rafter photos, so engineering has to guess or ask.
- Equipment locations aren't agreed with the homeowner.
- The meter number is missing.
- Photos are uploaded without notes saying what each one shows.
A short review step, where someone in operations checks the survey against the list before it goes to engineering, catches most of these.
Keeping the survey on the job
A survey is only useful if engineering, operations, and the crew can all find it later. In Solar Nest, site visits, crew comments, and photos are tied to each job, so the survey lives on the same record the job carries from sold to funded.
- Rep survey or company survey, chosen at intake. The job records who is doing the survey from the start.
- Site Survey work orders on the crew calendar. The visit is scheduled as a work order, so the crew and office see the same appointment.
- A checklist that gates the stage. Site survey has its own checklist, and the job can't advance to engineering until it's complete.
- Adders from checklist flags. When the survey flags something like a panel upgrade, the related adder is triggered on the job instead of being remembered later.
- AHJ and utility requirements preloaded. A built-in database of AHJ and utility requirements helps the team know what each job needs.
- Stalled surveys show on the board. Each job has an owner and a follow-up date, and a survey that runs past its expected time shows up on the board instead of sitting quietly.
- Project chat on the job. When engineering has a question about the survey, it gets asked and answered on the project, where the crew and office can see it.
Solar Nest tracks engineering as a stage between site survey and permit. It doesn't replace your 3D design tool.
Printable checklist
- Survey type confirmed (rep or company)
- Roof planes photographed, with condition and obstructions
- Attic or rafter photos where accessible
- Main panel photos with legible label
- Main breaker and bus rating recorded
- Meter photographed with number visible
- Equipment locations agreed with homeowner
- Access notes for the crew
- Homeowner requests recorded
- Photos and notes attached to the job
- Issues flagged for engineering
- Job moved to engineering with an owner and follow-up date
Related guides
- Solar permit to PTO: a checklist for installers
- Solar project management for everything after the sale
See it on a sample project
Want every survey photo and note on the job, not on a phone? Book a demo. We'll walk a sample project from sold to funded.